HOLES DRILLED IN MOUNTAIN VALLEY PIPELINE (USA)

Posted on July 5, 2024 –

Earlier this year a series of holes were drilled into the mountain valley pipeline. These attacks were strategically placed between mile markers 236 and 239. It is clear to us that those who built this black snake did not adequately fix these holes. As there is now gas flowing through this horrendous beast, we are forced to ask for help in holding them accountable. These entire sections of pipe need to be replaced. Be creative. Make sure they hear you.

For those interested, decorating a pipe with holes (before gas is in it), is quite easy. All it takes is a normal household drill, larger drill bits made for metal (can be found at any hardware store, the ones with a tooth on the tip work best), WD-40, lots of extra drill batteries, and the ability to push hard for 5-10 minutes per hole.

We’ve found that it is sometimes helpful to have two people pushing on the drill together. Replace the drill bit after each hole to make the most of your time. It’s fun! We recommend giving it a try.

This fight ain’t over. The blood of this black snake is gushing out. Don’t let anyone convince you that people are done fighting this project.

with love and rage — fire and smoke

Submitted Anonymously Over Email
via: https://scenes.noblogs.org/post/2024/07/05/holes-drilled-in-mountain-valley-pipeline/